June 2013

May 2013

March 20, 2013

March 14, 2013

  • Expansions are enclosed and concrete floors are being poured
  • Framing for Biscotti's exterior is in progress
  • Dock area personnel have relocated and dock expansion is enclosed

October 17, 2012

  • Footings for the west wall expansion are being poured. 
  • The east side block wall has been assembled to create the access hallway for Biscotti's.
  • Biscotti's will be moving to Shull Hall for spring semester.
  • The Redeker Center computer lab will be moving to Shull Hall for spring semester.

August 24, 2012

  • The north and south Redeker entrances and the Rider skywalk will remain open this weekend.
  • Early Monday morning (8/27), the Rider skywalk and Redeker south entrance will be locked. Permanent signage will be installed next week with additional directions for pedestrian traffic.
  • The Redeker south doors will have signs identifying them as emergency exits only.  Evacuation and emergency exiting from the inside of Redeker out the south doors will always be possible.
  • Please see the attached plan for access points around Redeker.
  • The contractor will begin demolition next week starting in the corner near the Rider skywalk.  Work hours will be Monday through Friday, 7 a.m. - 5 p.m. If work is anticipated outside of these hours, there will be notification ahead of time.
  • Watch the Department of Residence website for updates